Muğla 3250 m² Artificial Turf Renewal

A comprehensive renewal project was carried out on the football field in Muğla, focusing on the artificial turf area. A total of 3250 m² of new artificial turf was installed as part of the project. The renewal process began with the complete removal of the old and worn-out turf surface. Subsequently, the necessary granule addition, gluing procedures, and infrastructure work were carefully completed for the installation of the new turf.

To ensure the safety of the field surface, shock pads were placed beneath the artificial turf. These shock pads were designed to minimize the risk of falls and injuries to players. They help absorb impacts by balancing the surface hardness, thus enhancing the safety of athletes. With this new arrangement, the field showed significant improvements in both playability and safety.

The chosen turf type for the renewal process was 50mm Power Grass. This special turf type is known for its aesthetic structure, which closely resembles natural grass, its durability, and long lifespan. Power Grass is preferred for artificial turf fields due to its superior performance, resistance to wear, and low maintenance requirements.

This renewal work transformed the football field in Muğla into a modern and safe sports area, allowing athletes to play in a healthier and more comfortable environment. These improvements to the field provide significant contributions both aesthetically and functionally.

Our Projects

Democratic Republic of Congo

Democratic Republic of Congo Football Field Construction

Avengrass's artificial grass football field project in the Democratic Republic of the Congo is a significant initiative supporting sports and community unity.

Sierra Leone

Sierra Leone 6.000 Capacity Football Stadium

Our project, which was realized as a turnkey project in only 9 months in the African city of Sierra Leone Bo, will soon be ready for the official opening. In this facility, where we have considered FIFA standards, the following stadium construction stages have been implemented by our expert team